Projects

I’langa Mall Phase 1-3

I’langa Mall Phase 1-3

Project Value: R950 000 000.00.
Client: Resilient Properties.
Project Description: I’langa Mall Phase 1-3 – MPUMALANGA.

Endecon was the appointed civil and structural engineer on the project, responsible for all civil works including stormwater, earthworks as well as roads and parking. In addition, Endecon were the structural engineers responsible for the design of all structural elements including water tanks, foundations, columns, beams, suspendedslabs, retaining walls, structural steel roofs, canopies, concrete hardstands, concrete fly ramp & Structural Steel Gantry over the N4. Endecon had to design/oversee varies slab demolitions where columns had to be strengthenedto accommodate new retail areas. The first Ice rink was built in Nelspruit Mpumalanga where a special concrete mix design had to be specified.Endecon had a Resident Engineer on site to inspect all works and see that the contractor carried out the works in accordance with the specifications, regulations and engineering drawings.

Rehabilitation of Road P127/2

Rehabilitation of Road P127/2

Project Value: R182 000 000.00.
Client: Mpumalanga Provincial Government – Department of Public Works, Roads, and Transport.
Project Description: Rehabilitation of Road P127/2 – MPUMALANGA. Contract No PWRT/2017/12/MP – Rehabilitation of Road P127/2 from the N4 to D914 in the Nkangala Region of Mpumalanga Province. Road Distance: 21km.
Mbombela Square

Mbombela Square

Project Value: R260 000 000.00.
Client: Rangeview.
Project Description: Mbombela Square – High Court – MPUMALANGA.

The project comprises four buildings all of which are of reinforced concrete frames with brick-infill panels and profiled sheeted or concrete roofs. Foundations are conventional reinforced pad footings. Block 1 has one level of basement parking and nine storeys of office area. At ground floor there is also an open parking deck. Block 2 has one level of basement parking and seven levels of office area. Block 3 has two parking levels and two levels for restaurant and shops. Block 4 comprises three levels of shopping and restaurant. The buildings are connected by elevated walkways. Endecon is responsible for the design and site supervision of the civil works (bulk excavation, storm water and sewer) and the structural work associated with the buildings.

Karino Lifestyle Estate

Karino Lifestyle Estate

Project Value: R670 257 000.00.
Client: Belton Park Traiding 27 (Pty) Ltd.
Project Description: Affordable Housing Project – MPUMALANGA.

Endecon was the appointed Project Manager/Engineer who managed the following disciplines:

  • Bulk Water Supply
  • Bulk Sewer
  • Sewer Reticulation
  • Overhead Electrical
  • Mechanical and Electrical
  • Show Houses
  • Top Structures
  • Security Fence
  • Flats
  • Landscaping
  • Roads/streets – Bus routes
  • Traffic Circles
Sondela Pumpstation and Pipeline

Sondela Pumpstation and Pipeline

Project Value: R88 032 562.61.
Client: Magalies Water.
Project Description: Sondela Pump station and Pipeline – NORTH-WEST.

Design and construction of Sondela Booster Pump station and Pipeline. Pipeline Distance : 5.6km. Endecon had a Resident Engineer on site to inspect all works and see that the contractor carried out the works in accordance with the specifications, regulations and engineering drawings.

Thomeng Road

Thomeng Road

Project Value: R21 284 900.00.
Client: North West Department of Rural, Environmental and Agricultural Development.
Project Description: Construction of Thomeng Road – NORTH-WEST.

Design and construction of Thomeng Road. Road Distance : 6.2km. Endecon had a Resident Engineer on site to inspect all works and see that the contractor carried out the works in accordance with the specifications, regulations and engineering drawings.

Upgrading of Roads

Upgrading of Roads

Project Value: R104 399 464.
Client: Road Agency Limpopo.
Project Description: Upgrading of Roads – LIMPOPO.

Contract No. RAL/C627- Upgrading (Gravel to Surfaced Standard) Of Roads D1944, D2775, D2925, from Pienaarsrivier/Zwartkop (D1944) To Rapotokwane: Witlaagte, In the Waterberg District of Limpopo Province Road Distance: 16km

New Mediclinic Midstream

New Mediclinic Midstream

Project Value: R225 000 000.00.
Client: Mediclinic.
Project Description: Construction of Mediclinic Midstream Hospital, Civil and Structural Services – GAUTENG.

Endecon was the appointed Civil Engineer on the project, responsible for all civil works including storm water, bulk sewer, earthworks as well as roads and parking. Endecon also conducted regular site inspections to ensure that the contractor carried out the works in accordance with the specifications, regulations and engineering drawings.

Parkdene (Urbika) Lifestyle Estate

Parkdene (Urbika) Lifestyle Estate

Project Value: R487 828 241.73.
Client: Real Living Space (RF) (Pty) Ltd.
Project Description: Affordable Housing Project – GAUTENG.

Parkdene Phase 1 Civil – Endecon is the appointed Project Manager / Engineer for the Construction activities of all civil works (water, sewer, storm water and internal roads related) and bulk earthworks platforms for Urbika Urban Lifestyle: Apartments, consisting of 18 no. of Res 3 block units and a clubhouse. Parkdene Phase 1 Structures – Construction activities of all structural works (masonry, concrete and structural steel related) for Urbika Urban Lifestyle: Apartments, consisting of 18 no. of Res 3 block units and a clubhouse. Parkdene Phase 2 Civil – Construction activities of all civil works (water, sewer, storm water and internal roads related) for Urbika Urban Lifestyle: Lake View, consisting of 258 no. of Res 2 erven and a clubhouse.

Salt Rock City Shopping Centre

Salt Rock City Shopping Centre

Project Value: R120 000 000.00.
Client: EM & EM Engineering Pty Ltd.
Project Description: Salt Rock City Shopping Centre – KZN.

Endecon was the appointed Civil and Structural Engineer on the project, responsible for all civil works including stormwater, bulk sewer, earthworks as well as roads and parking. In addition, Endecon were the structural engineers responsible for the design of all structural elements including water tanks, foundations, columns, beams, suspended slabs, retaining walls, structural steel roofs, canopies and concrete hardstands. Endecon had a Resident Engineer on site to inspect all works and see that the contractor carried out the works in accordance with the specifications, regulations and engineering drawings.

Watercrest Mall

Watercrest Mall

Project Value: R550 000 000.00.
Client: Watercrest Mall.
Project Description: New Watercrest Mall – KZN.

Endecon was the appointed Civil and Structural Engineer on the project, responsible for all civil works including stormwater, bulk sewer, earthworks as well as roads and parking. In addition, Endecon were the structural engineers responsible for the design of all structural elements including water tanks, foundations, columns, beams, suspended slabs, retaining walls, structural steel roofs, canopies and concrete hardstands. Endecon had a Resident Engineer on site to inspect all works and see that the contractor carried out the works in accordance with the specifications, regulations and engineering drawings.

Global Macadamias processing plant

Global Macadamias processing plant

Project Value: R225 169 029.00.
Client: Global Macadamias Pty Ltd.
Project Description: New Global Macadamias Processing Plant.

Endecon was appointed as the Principle Agent on the project, responsible for project management of the project as well as the coordination of all consultants involved in the project. In addition, Endecon was the appointed civil and structural engineer. Global Macadamias processing factory will have the capacity to be the world’s largest macadamia processing plant. Endecon’s involvement in the development of this facility has enabled us to become leaders in this specialised field.